C&K Industry's commitment and focus is on meeting the needs of
customer through continuous improvement activities. We help to provide the right solutions for the tough and
immediate issues. Example: Industrial Vacuuming
Challenge:
The plant operation was losing valuable production capacity to
support its customer demand. This lost capacity equated to roughly
$8mm in annual sales revenue and the ability to meet the expected
delivery requirements.
Root Cause: The customer was required to shut sown for a full
24 hours on a weekly basis to clean its exhaust systems.
Solution: The customer called on C&K and asked for assistance
in trying to generate a solution to this issue. Working closely with
the customer's engineering, maintenance and production departments,
it was determined that through simple monitoring, the exhaust
cleaning could be reduced to every other week, and completed in an 8
hour time frame.
Result: The Company now has the additional required capacity
Example: Water Blasting
Challenge:
The National Park Service needed to construct concrete caissons for
a nature trail. Using conventional machinery would have potentially
damaged the park ecosystem (e.g. Backhoes-Drilling Rigs-Dozers-etc.)
Root Cause: Because of the location to the proposed nature
trail, it would have been extremely risky to try and move drilling
rigs and excavating equipment in the area.
Solution: C&K was called on to to use their ultra-high
pressure water blast equipment to handle the job.
Result: The customer saved significant time, and most
importantly, completed the job without harming the environment.
Example: Water Blasting
Challenge: A chemical plant customer needed to install a
massive mixing tank into its facility while minimizing downtime.
Root Cause: Because of the mixing tank's massive size, it
would require the moving of equipment and product to install. This
process was estimated to take upwards of 3 weeks.
Solution: C&K was able to use its ultra-high pressure water
blast equipment to precisely cut a hole into the second floor and
hoist the tank in without interrupting production. Result:
The entire process took 1 week with production running; as opposed
to shutting down production for a minimum of 3 weeks.
Example: Specialized Site Service
Challenge:
A customer had tooling that was stored off site for several years
and was believed to have been contaminated. They needed to have the
tooling inspected, cleaned and relocated to a new storage facility.
Root Cause: The initial investigation had shown that the
process would cost the company approximately $2mm.
Solution: C&K took the lead to help streamline the process
and still meet all EPA requirements.
Result: C&K saved the customer approximately $1mm dollars over
their original projections.
Example:
Pipeline Inspection Services
Challenge: Dangerous flooding continually occurred on a major
highway during heavy rain storms. The client thought that just a
routine sewer cleaning would be required.
Root Cause: The problem turned out to be more significant in
that the 48" sewer lines were 80% blocked with hardened concrete.
Solution: C&K utilized its specialty sewer cleaning equipment
to remove the obstructions. The process was accomplished by using
existing accesses with no additional digging equipments.
Result: C&K utilized its specialty sewer cleaning equipment
to remove the obstructions. The process was accomplished by using
existing accesses with no additional digging requirements. The
blockage was removed and 100% capacity was restored without
interrupting traffic. |